Damietta Quay Wall

The Engineering Authority of the Armed Forces started the construction of a multi-purpose terminal in Damietta Port and berths of 630 meters long and 17 meters deep in order to receive new generations of large submersible ships.
The aim of the project is to increase the capacity of the port and to increase the capacity of the port and to meet the increasing demand for general cargo berths. This project will also reduce the waiting time for vessels in the port’s external layout and increase operating rates.

Type
Length of wall (m)
Quantities (m3)
Remark
Barrettes (Isolated Walls)
45
31500
"800 mm Thickness
2.5 m Width
45 m Depth"

Technical Challenges: Supply, installation and implementation of a number of barrettes using mechanical equipment (Hydraulic Grab) with , 2.5-meter-width, 80-cm-thichness with a depth of no more than 45 meters measured from 1 m below the platform level
 
 

Project name: Damietta Quay Wall

Location: Damietta, Egypt

Client: Damietta Port authority

Main Contractors:  El Dawlia Contracting 

Starting date: 12/15/2015

Completion date (estimated): 11/1/2017